Learning Through Timber

Written by Wood Campus

Nov 28, 2023

Industry | News

AUSTRALIAN architect members of the global organisation Architects Declare are having their say on the National Construction Code updates to make sure every new home – without costing more – will raise the required standards of sustainability.
The new ‘living lab’ at NMITE will act as a home for Centre of Advanced Timber Technology students to learn more about timber and a net zero approach to building materials.
A new purpose built 2,500sqm ‘living lab’ for the New Model Institute for Technology and Engineering (NMITE) is designed for Centre of Advanced Timber Technology (CATT) students to learn more about a net zero approach to building materials.

Taylor Lane was selected by NMITE for the new site on Skylon Park in Hereford. The building itself demonstrates advanced timber technologies and is acting as an exemplar in a region aspiring to net zero carbon targets.

NMITE is home to CATT with a strategic mission set by industry to: “stimulate collaboration across the industry together with showing a wider audience how rewarding a career in timber can be.” The first intake of CATT students was in September 2022 on the Timber Technology Engineering and Design short CPD courses. These courses are blended courses composed of online distance learning and on-campus challenge sprints. When the learners are at NMITE they are hosted in the purpose built 2,500sqm ‘living lab’ building which consists of studio and breakout spaces, as well as two 700sqm workshop areas.

As the appointed timber frame supplier Taylor Lane was tasked with providing timber frame insulated wall panels and used a selection of non-standard materials specified by NMITE to construct 20 panels. These range from 250 to 2400mm wide, and 4100mm high.

The insulated panels were installed over two phases – a 53Lm run and another spanning 33Lm. This was particularly challenging as Paul Harris, contracts director for Taylor Lane Timber Frame explains. “The glulam structure including the roof element, and cross laminated timber (CLT) frame were already in position which meant that we had to crane the panels in and around an already constructed structural frame. This was tricky and took careful consideration in devising a suitable method of work and appropriate access equipment.”

Source: Timber Media

More News

FSC awareness doubled since pre-lockdown

FSC awareness doubled since pre-lockdown

Awareness of the FSC logo in the UK has increased 45% since 2019[1], and the proportion of those claiming both good and rough knowledge of the logo has more than doubled. With data from the Office for National Statistics revealing that nature had supported people’s...

BWF research shows homeowners positive over timber

BWF research shows homeowners positive over timber

New research from the British Woodworking Federation (BWF) reveals signs that timber windows and doors are viewed positively by homeowners, but that misunderstandings over their performance persist. The survey of 1,500 homeowners unearthed the main factors guiding...

Asia’s largest timber building

Asia’s largest timber building

‘Like entering a forest’: Inside Asia’s largest timber building Singapore CNN — Singapore has long billed itself as a “garden city,” a term coined in the 1960s by the country’s founding father and former prime minister, Lee Kuan Yew. In the decades since, the island...

Call for Entries live for Wood Awards 2023

Call for Entries live for Wood Awards 2023

The call for entries for the Wood Awards 2023 is now live! Enter your wood-centric building, furniture or product before 23 June 2023 and have your work recognised as the best in the UK. Architects, engineers, installers, furniture makers, product designers – or...

Timber Shortages Ease

Timber Shortages Ease

The timber shortage has brought price hikes and delays, but there is good news as supply increases. A timber shortage which has frustrated homebuilders all year is “highly likely” to be over, according to the Timber Trade Federation (TTF). This, the TTF says, is...

Grand Entrance For UC4 Glulam

Grand Entrance For UC4 Glulam

A new school auditorium for Horris Hill Preparatory School on its rural campus near Newbury, Berkshire, has been transformed using structural engineered timber and a Use Class 4 (UC4) treated glulam portico. The choice of materials for the new David Brownlow theatre...

Use Wood With A Clear Conscience

Use Wood With A Clear Conscience

Sara Kulturhus in Skellefteå has made it to the final of the International Award for Wood Architecture, the winner of which will be announced on 7 April. “It’s vital to make construction climate-neutral, and wood is a natural material. With Sara Kulturhus, we’ve shown...

The 2021 wood awards winners announced

The 2021 wood awards winners announced

Six structures and two product designs have been announced as the Wood Awards 2021 winners at a ceremony on 25 November held at the Building Centre, London. Established in 1971, the Wood Awards is the UK’s premier competition for excellence in architecture and product...